Search the Community
Showing results for tags 'scheduling'.
Found 2 results
-
Hi, I have a huge application with multiple sequences and functions(sequences). Now in the same application I want to add scheduling part(set value to a channel at certain days of the week). Eg: User will select days of week and a time. I want to set a value to a channel when system clock hits the user selected day and time. I am planning to do it with a sequence using while loop and waituntil function. So, I wanted to know is it possible to run multiple sequences simultaneously in Daqfactory? I have one startup sequence currently, so after adding the scheduling part can I make multiple sequence to run at startup and keep running one in while loop without affecting other operations it is supposed to do? Or is there any other efficient way I can perform an action for certain days of the week at a specified time? Thanks!
- 3 replies
-
- scheduling
- sequences
-
(and 2 more)
Tagged with:
-
Hi Guru, I am currently working on the Murphy 467 Controller to achieve multiple scheduling for my pumps. Controller: https://www.fwmurphy.com/uploaded/documents/pdfs/obsolete/00-02-0672.pdf http://irrigationautomation.iassys.com/wp-content/uploads/2014/07/Manual_467_IAS.pdf I am getting the following error when I try to run the scheduling part. Timeout and Port locked error are throwing up in my log. I am currently a new DaqFactory user. Let me know if I can assist you with any other information. Thanks!
- 5 replies
-
- modbus
- scheduling
-
(and 2 more)
Tagged with: